By fasting or other metal alloy rolled into bars of fasting for the skeleton type, with glass and other materials from the closure of the parapet walls of the tube. The installation of glass curtain wall glass curtain wall in accordance with the general structure can be divided into the glass curtain wall and glass curtain wall two types of earthquake. Actinomycosis measurement before installation, leveling, fixed iron. Ordinary glass curtain wall can be assembled at the scene. Install vertical and horizontal profiles of the metal skeleton, and then insert into the glass case-by-block. Seismic glass curtain wall at the scene in general the use of factory pre-installation methods, prefabricated wall panels assembled in a factory with a good (including the metal frame of the assembly, glazing and sealing tape, etc.), shipped directly to the scene in place lifting. Prefabricated building wall panels and is fixed to the top of the fasting pre-block square steel beams directly embedded iron pieces placed in the bracket with the pad, and then fixed bolts and iron pieces.